Skip to main content

IEC TS 63189-1:2023

Current Date published:

Virtual power plants - Part 1: Architecture and functional requirements

IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including power generation forecasting, load forecasting, generation and consumption scheduling, control and management of energy storage devices and loads, coordinated optimization of distributed energy resources, status monitoring and communication, data collection and analysis, and market transactions.
Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems).
Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.

Get this standard Prices exclude GST
PDF ( Single user document)
$278.26 NZD
HardCopy
$316.52 NZD
Networkable PDF
Price varies
Pages: 24

Keep me up-to-date

Sign up to receive updates when there are changes to this standard

Related Information

Similar Standards

  • AS/NZS 62110:2021

    Electric and magnetic field levels generated by AC power systems - Measurement procedures with regard to public exposure

  • BS 6662:1985

    Guide to methods of measurement of short duration transients on low voltage power and signal lines

  • BS 7430:2011+A1:2015

    Code of practice for protective earthing of electrical installations

  • BS EN 50110-1:2023

    Operation of electrical installations, General requirements

Pages: 24