Skip to main content

BS 1113:1989

Withdrawn Date published:

Warning: Withdrawn Standard. This document has been replaced by:

Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)

Includes materials and design stresses, workmanship, inspection, testing, documentation and marking, valves, gauges and fittings of: (a) steam generating plant subject to internal pressure; (b) parts of steam and water heating plant.

Get this standard Prices exclude GST
PDF ( Single user document)
$693.00 NZD
HardCopy
$739.00 NZD
Pages: 74

Previous versions

Related Information

Similar Standards

  • BS EN 12952-1:2015

    Water-tube boilers and auxiliary installations, General

  • BS EN 12952-1:2015 - TC

    Tracked Changes. Water-tube boilers and auxiliary installations, General

  • BS EN 12952-10:2021

    Water-tube boilers and auxiliary installations, Requirements for safety devices against excessive pressure

  • BS EN 12952-10:2021 - TC

    Tracked Changes. Water-tube boilers and auxiliary installations, Requirements for safety devices against excessive pressure

Pages: 74

Previous versions