Skip to main content
0 Cart

AS/NZS 5601.1:2022 A1

Current Date published:

Gas installations, Part 1: General installations

Amendment applies to the following elements: • Preface • Clauses 5.2.11, 6.4, 6.4.1 and 6.10.1.1 • Table 6.10.2.3

Get this standard Prices exclude GST
PDF ( Single user document)
$0.00 NZD
Online Library ( Annual subscription)
Info Price varies

Related Information

Similar Standards

  • AS/NZS 4552.2:2010

    Gas fired water heaters for hot water supply and/or central heating - Minimum energy performance standards for gas water heaters

  • AS/NZS 4645.1:2018


    Gas distribution networks - Part 1: Network management

  • AS/NZS 4645.2:2018


    Gas distribution networks - Part 2: Steel pipe systems

  • AS/NZS 4645.3:2018


    Gas distribution networks - Part 3: Plastics pipe systems