Skip to main content
0 Cart

Appendix I to NZS 5261:2003

Superseded Date published:

Warning: Superseded Standard. This document has been replaced by:

AS/NZS 5601.1:2010


Gas installation - Large installation commissioning (Appendix I)

Separate A4-sized version of the typical commissioning procedure for large installations (Appendix I). It is also included in NZS 5261:2003, but as A5 in size. Please note that these are general guidelines. They should not be used in place of the specific commissioning instructions that are required to be part of the instructions accompanying the appliance (refer to NZS 5262 and AS 3645).

Get this standard Prices exclude GST
PDF ( Single user document)
$0.00 NZD
Networkable PDF
Price varies
Online Library ( Annual subscription)
Info Price varies

Keep me up-to-date

Sign up to receive updates when there are changes to this standard

Related Information

Similar Standards

  • AS/NZS 4552.2:2010

    Gas fired water heaters for hot water supply and/or central heating - Minimum energy performance standards for gas water heaters

  • AS/NZS 4645.1:2018


    Gas distribution networks - Part 1: Network management

  • AS/NZS 4645.2:2018


    Gas distribution networks - Part 2: Steel pipe systems

  • AS/NZS 4645.3:2018


    Gas distribution networks - Part 3: Plastics pipe systems