Skip to main content

ISO 1920-14:2019

Current Date published:

Testing of concrete — Part 14: Setting time of concrete mixtures by resistance to penetration

This document covers the method for determining the setting time of concrete with slump greater than zero, by testing mortar sieved from the concrete mixture. The initial setting time and the final setting time are the time intervals required for the mortar sieved from the concrete mixture to reach the specified values of penetration resistance after the initial contact of cement and water.

The method can be used for determining the effect of variables such as temperature, type and content of cement, concrete mix proportions and admixtures, on the time of setting and hardening characteristics of concrete.

This test method is applicable under controlled laboratory conditions, as well as under field conditions.

Get this standard Prices exclude GST
PDF ( Single user document)
$79.13 NZD
Networkable PDF
Price varies
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 5

Keep me up-to-date

Register to receive notifications when updates are made to this standard.

Related Information

Similar Standards

Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 5

ISO 1920-14:2019

Get this standard Prices exclude GST
PDF ( Single user document)
$79.13 NZD
Networkable PDF
Price varies

Request to add this standard to your subscription

ISO 1920-14:2019

Price varies
Online library subscription

Click "Send request for subscription" to ask your Account Administrator to add this standard to your subscripiton.

Cancel