Treated timber framing – maximum weather exposure

Where H1.2 boron-treated timber framing has been left in the weather for more than 3 months – timber stored uncovered on site or as erected frames – it will generally require some verification that the treatment level is still adequate to satisfy the requirements of NZS 3640:2003 Chemical preservation of round and sawn timber.

Published in building.