Forgot password?
Over 700 NZS and joint AS/NZS standards Incorporating the needs of multiple industries working across construction.
General conditions of contract for the supply of equipment without installation: Amendment 1
$0.00
Specification for preservative treatment - Plywood: Amendment 1
Specification for preservative treatment - Laminated veneer lumber (LVL): Amendment 1
Specification for preservative treatment - Glued laminated timber products: Amendment 1
Recommendations for the painting of buildings: Amendment 1
$50.00
Specification for Portland cement (ordinary, rapid hardening, and modified): Amendment 1
$51.00
Code of practice for the general structural design and design loadings for buildings: Amendment 1
Unplasticized PVC pipe for cold water services: Amendment 1
Specification for preservative treatment - Plywood: Amendment 2
Specification for preservative treatment - Laminated veneer lumber (LVL): Amendment 2