Skip to main content

BS 752:1974

Withdrawn Date published:

Warning: Withdrawn Standard. This document has been replaced by:

Test code for acceptance of steam turbines

Primarily for constant speed condensing steam turbines driving electric power generators, whether superheated or saturated steam. Precautions for radiological safety where nuclear plant is involved. Gives sample calculation of heat rate for a large turbine.

Get this standard Prices exclude GST
PDF ( Single user document)
$395.60 NZD
HardCopy
$395.60 NZD
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 67

Related Information

Similar Standards

  • BS EN 12952-1:2015

    Water-tube boilers and auxiliary installations, General

  • BS EN 12952-1:2015 - TC

    Tracked Changes. Water-tube boilers and auxiliary installations, General

  • BS EN 12952-10:2021

    Water-tube boilers and auxiliary installations, Requirements for safety devices against excessive pressure

  • BS EN 12952-11:2007

    Water-tube boilers and auxiliary installations, Requirements for limiting devices of the boiler and accessories

Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 67

BS 752:1974

Get this standard Prices exclude GST
PDF ( Single user document)
$395.60 NZD
HardCopy
$395.60 NZD

Request to add this standard to your subscription

BS 752:1974

Price varies
Online library subscription

Click "Send request for subscription" to ask your Account Administrator to add this standard to your subscripiton.

Cancel