Skip to main content

BS 5671:1979

Withdrawn Date published:

Warning: Withdrawn Standard. This document has been replaced by:

Guide for commissioning, operation and maintenance of hydraulic turbines

Describes suitable procedures for commissioning hydraulic turbines and associated equipment and indicates how such turbines and equipment should be operated and maintained.

Get this standard Prices exclude GST
PDF ( Single user document)
$283.72 NZD
HardCopy
$283.72 NZD
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 20

Related Information

Similar Standards

  • BS 5860:1980

    Method for measuring the efficiency of hydraulic turbines, storage pumps and pump-turbines (thermodynamic method)

  • BS EN 45510-5-4:1998

    Guide for the procurement of power station equipment, Hydraulic turbines, storage pumps and pump-turbines

  • BS EN 60308:2005

    Hydraulic turbines. Testing of control systems

  • BS EN 60609-1:2005

    Hydraulic turbines, storage pumps and pump-turbines. Cavitation pitting evaluation, Evaluation in reaction turbines, storage pumps and pump-turbines

Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 20

BS 5671:1979

Get this standard Prices exclude GST
PDF ( Single user document)
$283.72 NZD
HardCopy
$283.72 NZD

Request to add this standard to your subscription

BS 5671:1979

Price varies
Online library subscription

Click "Send request for subscription" to ask your Account Administrator to add this standard to your subscripiton.

Cancel